Knitting with knitting needles of a man's sweater with a relief pattern. Diagram with photo and description for beginners

Knitting with knitting needles of a man's sweater with a relief pattern. Diagram with photo and description for beginners

Such a sweater model will not only be wonderfullook at your man, but also create coziness and maximum warmth in the cold season. Tie it with our simple diagram with a photo and description for beginner needlewomen. knitted with knitting needles for men green sweater with a relief pattern. Photo №1 Dimensions: 50/52 (54/56). Materials: 900 (950) g ​​yarn type "Pashmina" (78% wool Merino, 22% cashmere, thread density 125 m / 50 g) from Lana Grossa; knitting needles No. 4, circular knitting needles No. 4 with a length of 40 cm. Knitting density: 29.5 loops and 30 rows, a pattern of braids with -e = 10 x 10 cm, measured in a slightly stretched form; 25 loops and 28 rows of rubber = 10 x 10 cm, measured in a slightly stretched form; 36 loops of the aran pattern = 13 cm. Eraser: * 2 loops, 2 purl loops *, repeat from * - *. Garter stitch: front and back rows are knitted with facial loops. Embossed pattern: we knit according to the scheme. Numbers on the right edge indicate the front rows, in the back rows of the loop we sew according to the drawing. In the description, the distribution of loops is given. First-thirty-sixth rows are sewed 1 time, then repeat the repeat of the pattern, which is painted gray in the diagram. Description of work knitted with knitting needles for men green sweater with a relief pattern. Photo # 2 Back: we collect 122 (128) loops starting from the purl series, we sew 3 rows of garter stitch. Then we distribute the loops as follows: the edge loop, we bind between the arrows a (b) and c 2 (5) of the loop according to the scheme, between the arrows c and e we sew 22 loops 2 times. We loop between the arrows e and f 28 loops, adding 8 loops, as shown in the diagram = 36 loops, we sew 22 loops between the arrows e and 2 times, we sew 2 (5) loops between the arrows c and a (b), the edge loop = 130 (136) loops. We knit, as established, and add at the beginning and end of the third row, 24 loops, as shown in the diagram = 178 (184) loops. We knit the established pattern on the height of the backrest 43 (44) cm from the garter stitch. Next, close the armhole for 15 (17) loops at the beginning of the next two rows = 148 (150) loops. We knit the height of the arm 23 (24) cm with the established pattern. We close the loops and at the same time we sew 3 loops together with the face loops 2 times and 2 loops together with the facial loops 1 time on the braids. Before: knitting as a backrest to the height of the armhole 17 (18) cm. Then we knit to the central 20 loops, fix the yarn thread from the other tangle, close the central 20 loops, knit to the end of the row. Next we knit both sides at one time, but from different coats. We close on both sides of the cutout along the edges of the neck 3 loops 3 times, 2 loops 1 time and 1 loop 4 times. At a height of 6 cm from the beginning of the neck, we close the remaining 49 (50) loops for each shoulder. knitted with knitting needles for men green sweater with a relief pattern. Picture №3 Sleeves: starting from the back row, we collect 66 loops, and we sew the first loop after the edge loop and, before the edge loop, the last loop as an identical loop, knit with an elastic band and, at the same time, add 1 loop from each side in the sixth row from the set edge, then in each successive sixth row21 (15) times, then in each subsequent fourth row 3 (12) times = 116 (122) of the loop. We include the added loops in the elastic band. We knit an elastic band from the tying edge to a sleeve height of 52 cm. Place the markers on the right and left edges. We impose another 5 (6) cm, then loosely close the loops. The second sleeve is knitted similarly. Assembling and finishing. Straighten the parts and pierce the pattern, cover with a damp cloth and leave until dry. We carry out the side and shoulder seams, the seams of the sleeves to the markers. We lift up circular knitting needles, tying up the front loops, 104 loops along the edge of the neck. We close the knitting in a circle and connect the elastic band 22 cm. Loose by the pattern. Sew up your sleeves. We pull out the collar. knitted with knitting needles for men green sweater with a relief pattern. Photo №1

Comments

comments